Mulberry Dock School

Mulberry Dock School

Main Contractor
Kier Construction
Client
London Borough of Tower Hamlets
Sector
Education
Package Value
£4m

We are proud to share that Practical Completion was achieved on the impressive Mulberry Academy London Dock project — one of the first Passivhaus schools in London. Designed with exceptional air quality and minimal environmental impact, it required meticulous attention to detail throughout construction.

Titan Interior Solutions was responsible for delivering the Drylining, Suspended Ceilings, Acoustic Panels & Rafts, and Specialist Timber Panelling packages. Collaborating closely with Titan Interior Solutions and Titan Flooring Limited, our Horbury Group companies expertly delivered the carpentry and flooring packages.

The project team rose to the challenge of incorporating Passivhaus detailing into the drylined systems to deliver a building of outstanding quality. Congratulations to everyone involved.

Back to All Case Studies
Services Provided
  • Drylining
  • Suspended Ceilings
  • Acoustic Panels & Rafts
  • Specialist Timber Panelling
  • Carpentry & Flooring
Horbury Companies Involved
  • Titan Interior Solutions
  • Titan Interior Solutions
  • Titan Flooring
Enquire About a Project