Manchester Airport Terminal 2

Manchester Airport Terminal 2

Main Contractor
Laing O'Rourke
Client
MAG
Sector
Infrastructure
Package Value
£10.5m

This project forms part of the £600m Manchester Airport Transformation Programme. Titan Interior Solutions were responsible for a multi-trade contract of Ceilings, Partitions, Demountable Glazed Screens and the Toilet Fit Out package in the Terminal 2 Building.

Ceilings and Partitions (£8.5m): Titan's works included installation of over 12km of partitions and wall linings. The complex installation consisted of over 30 different wall types including Bespoke Shaftwall Systems, Security Walls and Lead-Lined Walls.

Demountable Glazed Screens (£500k): high performance screens including high acoustic and fire screens as well as bomb blast screens and steel frame supports. Toilet Fit Out (£1.5m): walls, metal ceilings, bulkheads, toilet cubicles, hygiene wall cladding and flooring.

Back to All Case Studies
Services Provided
  • Suspended Ceilings
  • Drylining and Partitioning
  • Demountable Glazed Screens
  • Refurbishment & Maintenance
Horbury Companies Involved
  • Titan Interior Solutions
Enquire About a Project